Where the power is not there yet
MyGrid and mobile battery.
The same skid, paired with integrated mobile battery storage, so a fleet begins charging before permanent utility power is complete. It is built for power-constrained sites, for phased developments, and for fleets that will not wait out an interconnection queue to get trucks moving.
The battery also earns while it waits. Charge it when power is cheapest and charge the trucks when it is not, so the way around the queue becomes a standing lever on cost per mile.
What it does
Charge now, interconnect later
- Charging available immediately, without depending on the grid
- Electrification starts while the permanent infrastructure is built
- Flexible power sourcing to hold uptime through peak demand
- A managed handover from mobile to permanent power
- Less exposure in the phase of a deployment that carries the most
Where it fits
Constrained, phased or in a hurry
- Yards facing utility delays or a hard power ceiling
- Temporary sites, and developments built in phases
- Fleets that want to move early and keep the risk small
- Backup power without a diesel generator, its fuel or its permit
Battery and skid are sold together, so the battery sits inside the funding application.
Bring us the yard the utility will not serve ›