
SeaTac · Now enrolling fleets
Electric drayage for Seattle and Tacoma.
The funding, the truck and the charging, handled.
A Zeem depot on I-5 at SeaTac, between the terminals and the warehouses they serve. For eligible NWSA drayage operators, public funding can cover up to 90% of an electric tractor, and we file the paperwork.
Rendering. Zeem SeaTac depot.
01FUNDING
Up to 90% of the tractor, funded.
For eligible NWSA drayage operators, NWSA funds stack with the Washington WAZIP voucher. We find, file and report.
02TRUCKS
Electric Class 8, available now.
Buy with the funding applied, or lease through our financing partner. Tell us your loads and lanes and we tell you whether it works.
03CHARGING
A place to park and charge.
Enroll each truck on its own and pay for what you use, at a depot staffed and run by Zeem. Already have electric trucks on order? Charge them here. Have your own yard? We can charge you there too.
Three parts. One contract. One accountable operator.
Grants & incentives
NWSA selected Zeem to lead the first project in its zero-emission drayage incentive program.
For eligible NWSA drayage operators, NWSA funds stack with the Washington WAZIP voucher. The NWSA funds are already awarded to Zeem, so you are not applying and waiting for that part. You bring the trucks and the lanes. We do the applications, the reporting and the follow-through for the life of the award.
Funding figures are public program maximums, not Zeem commitments. NWSA funds are for NWSA drayage operators. Eligibility varies by operator; programs are first-come, first-served and subject to change. Funding windows close.
- TrackWe watch the programs that fit Puget Sound drayage, so you move on current rules.
- FilterWe check what you qualify for against your trucks, terminals and lanes.
- ApplyWe write and file the WAZIP and NWSA applications on your behalf.
- AdministerWe see it through to the money. We track the voucher through delivery and answer to the funder for the life of the award. You provide data and approvals.
Not hauling for the terminals? WAZIP funding is still available for your trucks. Ask us
The depot
Zeem SeaTac, on I-5.
Between the terminals and the warehouses they serve, beside the Kent Valley logistics corridor.

Rendering. Zeem SeaTac depot, from above.
- Megawatt and DC fast chargingBuilt for Class 8 drayage duty cycles
- Pull-through lanesNo backing in with a chassis
- Fenced, lit and staffedSecure overnight parking
- Classes 1 through 8Open to every commercial fleet, not only drayage
- 97%+ readiness SLARun by the team behind the LAX depot
2612 S. 208th StreetSeaTac, WA
See the depot detailsHow enrollment works
Three steps, and you see the numbers before you sign.
Tell us about your trucks
How many, which terminals you serve, where they park overnight and how long they sit.
You getA first read on which funding fits.
We check the funding and your lanes
We confirm eligibility and look at your loads and routes. Ask about a demo on your lanes.
You getAn answer on whether it pulls your loads, before you commit.
Written estimate, then enrollment
Own or lease, with a written charging plan for every truck before it arrives.
You getOne contract, with the paperwork handled.
Zero-emission trucks · Financing · Insurance
Own it or lease it. The charging and the support are the same.
- Buy with the funding applied at purchase.
- Lease through our financing partner, subject to credit approval.
- Insurance for trucks leased through Zeem: physical damage cover through a program being finalized, held in your name through a licensed agent.


MyGrid · Your own yard
Have a yard, or want one? We can charge you there too.
MyGrid is Zeem's modular charging system, delivered on a skid and built for fleet duty cycles. Power in months, not years.
- Funding for charging, not only trucks. Washington utility programs and state incentives help pay for charging infrastructure. We find them and file for you.
- Built to be funded. Build America Buy America compliant and incentive ready.
- Start at our depot. Charge with us at SeaTac while your own site is built.
- One contract for the infrastructure, the operations and the financing.
Why Zeem
Chosen by the port. Proven at the busiest fleet EV depot in the United States.
The port chose Zeem in July 2025, backed by a $6.2M Washington State grant. The City of Seattle followed with $1.5M in truck incentives distributed through Zeem to local drayage operators.
Questions
What fleets ask us first.
The depot isn't open yet. Why talk now?
Do I have to apply and wait for the NWSA money?
Do I qualify for the NWSA funding?
I'm not a port drayage carrier. Can I still use the depot?
I have my own yard. Can you help there?
Who does the grant paperwork?
Will an electric tractor pull my loads?
Do I have to lease through Zeem?
What does it cost?
Start here
See if your fleet qualifies.
Tell us about your trucks. We come back with what you qualify for and the next step.
- Which funding fits your trucks or your yard
- A charging plan for your fleet
- Whether it works on your lanes
- A written estimate